---
title: "CleanSpark Posts $987M Annual Loss as Infrastructure Pivot Expands"
description: "The company reported $576.5 million in full-year revenue, held 13,530 bitcoin, and secured a $6.6 billion triple-net lease for AI and HPC facilities."
url: https://basisdesk.news/news/cleanspark-fy2026-financial-results-hpc-expansion
published: 2026-11-24T21:21:33.375Z
modified: 2026-11-24T21:21:33.375Z
section: Mining & Infrastructure
author: Basis Desk Newsroom (AI-generated, source-verified)
sentiment: neutral
tickers: [BTC]
tags: [cleanspark, bitcoin-mining, hpc, ai-infrastructure, earnings]
license: Quote with attribution to Basis Desk (basisdesk.news). Not financial advice.
---

# CleanSpark Posts $987M Annual Loss as Infrastructure Pivot Expands

The company reported $576.5 million in full-year revenue, held 13,530 bitcoin, and secured a $6.6 billion triple-net lease for AI and HPC facilities.

## At a glance

- **What happened:** CleanSpark reported fiscal 2026 revenue of $576.5 million and a net loss of $987.1 million, alongside a $6.6 billion HPC lease.
- **Why it matters:** The disclosures show the miner actively repurposing significant power capacity toward high-performance computing to diversify away from pure mining margins.
- **Who is affected:** CleanSpark shareholders, debt investors, and institutional data center counterparties.
- **What's next:** CleanSpark will host an earnings webcast on Nov. 24 and aims to commission its first Sandersville data hall in November 2027.
- **Primary source:** [SEC Form 8-K: CLEANSPARK, INC.  (CLSK, CLSKW) (CLSK, CLSKW) files crypto-related disclosure](https://www.sec.gov/Archives/edgar/data/827876/000119312526475677/clsk-ex99_1.htm) — SEC EDGAR Live Filings

## Key points

- CleanSpark posted a $987.1 million net loss on $576.5 million in revenue for fiscal year 2026.
- The miner held 13,530 bitcoin valued at $1.13 billion and $204.8 million in cash as of Sept. 30.
- A 20-year, $6.6 billion lease was executed for AI and HPC data centers, supported by $2.276 billion in note issuance.

## Editorial remark

- **Context:** Bitcoin miners have faced compressed margins and reduced post-halving mining yields, prompting several listed operators to repurpose contracted power capacity toward artificial intelligence and high-density compute facilities.
- **Impact:** CleanSpark shifts risk exposure toward long-term fixed compute leases and substantial corporate debt service, while keeping a massive corporate treasury of mined bitcoin.
- **Watch:** The first operational data hall delivery at the Sandersville campus is scheduled for November 2027, alongside commercial agreement executions in Texas.

CleanSpark reported a full-year net loss of $987.1 million on total revenue of $576.5 million for the fiscal year ended Sept. 30, according to an SEC Form 8-K filed on Nov. 24 [1]. Fourth-quarter revenue fell 46% year-over-year to $120.9 million, though the company recorded fourth-quarter net income of $9.8 million and adjusted EBITDA of $345.4 million [1]. Full-year revenue declined 25% compared to the prior fiscal year [1].

Total liquidity stood at roughly $1.3 billion at fiscal year-end, consisting of $204.8 million in cash and cash equivalents alongside $1.13 billion in $BTC holdings [1]. CleanSpark held 13,530 bitcoin at the close of the period, including collateral, after mining 7,253 bitcoin across fiscal 2026—an 8% drop year-over-year that coincided with an average hashrate drop of 21% to 36.0 EH/s [1]. The production figures follow CleanSpark's prior operational milestone, having [mined 529 Bitcoin in September](https://basisdesk.news/news/cleanspark-september-2026-bitcoin-production-update) before adjusting corporate reporting formats [1]. Fleet efficiency improved from 16.7 J/Th to 14.8 J/Th over the same fiscal timeframe [1].

## Pivot Toward High-Performance Computing

The company is directing capital toward artificial intelligence and high-performance computing data centers, anchored by a 20-year, $6.6 billion triple-net lease at its Sandersville, Georgia site with an unnamed high-investment-grade tenant [1]. CleanSpark funded that development by issuing $2.276 billion in 7.875% senior secured notes due 2031 [1]. Management noted that all primary development permits have been secured, targeting delivery of the initial data hall in November 2027 [1].

In Texas, the firm secured conditional Batch Zero baseload designations covering 585 MW across its Sealy and Brazoria assets, with total regional acquisition pipelines reaching up to 885 MW [1]. Exclusivity agreements at both Texas sites expired during a phase of regulatory uncertainty, prompting commercial talks with its Sandersville tenant and other prospective operators [1]. At the time of writing, Bitcoin traded near $59,782 amid broader weakness in digital asset valuations.

## Sources

1. [SEC Form 8-K: CLEANSPARK, INC.  (CLSK, CLSKW) (CLSK, CLSKW) files crypto-related disclosure](https://www.sec.gov/Archives/edgar/data/827876/000119312526475677/clsk-ex99_1.htm) — SEC EDGAR Live Filings, 2026-11-24

---
Basis Desk Newsroom · AI-generated, source-verified · https://basisdesk.news/about/how-we-use-ai
